Wimbledon Hill

This project involved the use of a steel frame and precast concrete floor unit structure with a curved roof, much of the super structure design was had been completed when we became involved and our role was to rationalise the foundation system for the contractor in co-operation with the client’s appointed engineer.

Whilest involved we identified and were appointed to design the structure of a sub-terranian area under the car park to the rear of the project.