This Brand New vehicle repair center was constructed on traditional foundation with a steel portal framed building, a contrado fire boundary was designed to the rear of the site.
The special gigging grids were set out and detailled on the Floor slab drawings and the precast wall detail clipped to the steel frame reducing alot of time against traditional blockwork, this detail was proposed priced and designed by R M Design and Mangement Studios.
The practice also proposed the re-arrangement of the cladding to place the liner panel on the inside of the sheeting rails with intumecent strips to prevent the cold bridge, reducing the requirement for mini zeds or the dust traps ontop of the sheeting rails.